Assessment schedule for contract labour

Under The Workers Compensation Act, the Workers Compensation Board of Manitoba (WCB) has the responsibility to provide compensation coverage for most workers in Manitoba. This includes individuals who work on a contract basis in mandatory industries.  

For assessment purposes, the WCB calculates a contract worker’s earnings based on a labour percentage, which is the estimated labour portion of a contract. The WCB only charges employers premiums on that labour portion.  

If an employer disagrees with the labour percentage, the WCB will consider documentation from the principal or contractor to support a different labour cost.  

In some situations, the contractor does not provide materials or equipment when completing a contract job (for example, they do not have their own tools and/or vehicle necessary to do the job). In these circumstances, reporting 100% of the contract value as labour is appropriate. If the contractor uses their own vehicle and/or hand tools, you would generally report 85% of the contract as labour. However, if the contractor provides most of the materials or significant tools needed to complete the job, you should confirm the appropriate labour percentage identified in the following schedule.

Policy 35.10.50, Status of Workers, Independent Contractors and Workers provides more background and information if required.

Schedule of industries

Materials supplied (if applicable)

Labour portion of total contract

Acoustic ceiling installation 

Major materials 

40%

Air testing and balancing 

85%

Blasting 

For roadwork

For other 

25%

85%

Blinds installation 

Major materials 

40%

Bridge repairs 

25%

Brush clearing 

85%

Building movers 

25%

Cabinet installation 

Major materials, minor installation

Major materials, major installation 

10%

40%

Carpentry, general (other than framing and finishing) 

Major materials 

45%

Carpet installation 

Major materials 

25%

Chain link fence installation 

Major materials 

50%

Chemical spraying 

25%

Concrete work 

Major materials 

55%

Countertops 

Supply and install granite, stone

Supply and install laminate 

10%

40%

Courier operations 

65%

Demolition 

25%

Diamond drilling 

25%

Doors, window installation 

Major materials 

40%

Drapery installation 

Major materials 

40%

Drywall installation 

Major materials 

40%

Drywall taping 

Major materials 

80%

Dump truck operating 

25%

Dust control on roads (oiling) 

25%

Eavestroughing 

Major materials 

45%

Electrical installation 

Major materials 

50%

Elevator installation 

25%

Equipment operators – NEC 

25%

Excavation 

25%

Fascia, soffit installation 

Major materials 

Fiberglass repair – on site 

Finishing carpentry 

Fixtures installation 

Major materials

Minor installation

10%

40%

Flooring – NEC 

Major materials 

30%

Foundations 

50%

Framing 

Major materials 

45%

Garbage removal 

50%

Gasoline tanks installation 

25%

General maintenance 

Major materials 

85%

Handi-transit owner-operators 

50%

Hardwood flooring installation 

Major materials 

30%

Hardwood floor finishing/refinishing 

Major materials 

70%

Heating and air conditioning 

Major materials 

50%

Home construction (entire house) 

Uses sub-contractors

Major materials

10%

40%

Inspection of buildings 

85%

Insulation 

Major materials 

50%

Janitorial service 

85%

Land clearing 

25%

Landscaping 

Major materials 

50%

Linoleum installation 

Major materials 

40%

Locksmithing 

Major materials 

40%

Logging 

Chain saw

Major materials

85%

25%

Masonry 

Major materials 

50%

Mechanical repair 

Major materials 

50%

Mobile pressure wash (from truck) 

50%

Mobile welding 

50%

Nuisance grounds, management/supervision 

Light equipment

No equipment

25%


85%

Oil and gas wells 

Major materials 

80%

Ornamental iron/metal installation 

Major materials, minor installation

Major materials, major installation 

10%

40% 

Overhead door installation 

Major materials 

40%

Painting and decorating 

Major materials 

80%

Pest control (i.e. dog catcher) 

85%

Piling 

25%

Plastering 

Major materials 

65%

Plumbing 

Major materials 

50%

Power line construction 

25%

Railway construction 

25%

Refrigeration 

Major materials 

50%

Roadwork 

25%

Roofing 

Major materials 

40%

Sandblasting/pressure washing (non-mobile) 

80%

Security services 

With vehicle

Without vehicle 

85%

100%

Security system installation (excludes vehicles) 

Major materials 

50%

Sewage/septic tank cleaning (mobile and/or video services) 

50%

Sewer and water construction 

25%

Sheet metal installation (commercial, exterior) 

Major materials 

40%

Ship building and repairs 

75%

Sliding installation 

Major materials 

40%

Sign installation 

Major materials 

40%

Snow removal 

25%

Soil testing (infield) 

Major materials 

25%

Sprinkler system installation 

Major materials 

50%

Structural steel 

50%

Stuccoing 

Major materials 

65%

Swimming pools installation 

50%

Tear-out and removal (i.e. gutting buildings) 

75%

Tile setting 

Major materials 

35%

Towing 

50%

Trenching, drainage 

25%

Trucking, intra-city 

50%

Trucking, long haul 

25%

Ventilation 

Major materials 

50%

Waterproofing basements 

Membrane application

Excavation required 

80%

25%

Water well drilling 

25%

Wharf construction 

25%

Window cleaning 

Major equipment (i.e. cherry picker) 

Minor equipment (i.e. scaffold, swing stage ladder) 

25%


85%