Skip to content
{notification.title}
{notification.description}

Classification sub-group 407-02 - Sewer and water construction

Industry sector 4 – Construction

Rate risk category 300%
IncludedSimilar but classified elsewhere
  • Installation, repair or replacement of sewer and water services in new developments or areas with existing service.

    Includes incidental excavation and trenching. May also use “hole and tunnel” method.

  • Horizontal coring systems (other than the “Armadillo Coring System”).